2023-09-17
Uploaded Date: 2023-09-17
Uploaded Date: 2023-09-17
Uploaded Date: 2023-09-17
Uploaded Date: 2023-09-17
Uploaded Date: 2023-09-17
Uploaded Date: 2023-09-17
Uploaded Date: 2023-09-17

Fast Track Roadway Excavation At Ipa Site

2022-06-24
Uploaded Date: 2022-06-24
Uploaded Date: 2022-06-24
Uploaded Date: 2022-06-24
Uploaded Date: 2022-06-24
Uploaded Date: 2022-06-24
Uploaded Date: 2022-06-24
Uploaded Date: 2022-06-24

Project Manager

Name: Rojan Hemikha

Cell: 9851152419

E-mail: hemikharojan222@gmail.com

Project Status

Physical
0%
15/02/2018 07/01/2020
Financial
0%
15/02/2018 07/01/2020

Complete

2022-01-19
Uploaded Date: 2022-01-19
Uploaded Date: 2022-01-19
Uploaded Date: 2022-01-19
Uploaded Date: 2022-01-19
Uploaded Date: 2022-01-19
Uploaded Date: 2022-01-19
Uploaded Date: 2022-01-19

Project Detail:

Fast Track Roadway Excavation At Ipa Site
Roadway Excavation, Roadway Embarkment Construction, Cross Drainage Structure of Fast Track Project at Ipa Site
Ministry Of Defence, Nepal Army , Kathmandu – Terai/Madhesh Fast Track (Expressway Road Project)
KTFT/NCB/WORKS/2074/075-05
15/02/2018
23 Month
345,540,136.16

Progress Pictures